PAVEMENT MANAGEMENT SYSTEM
The City of Greenville has embarked on a long-range program by developing of a Pavement Management System (PMS) that allows for a proactive and holistic approach in safeguarding one of the city’s most dynamic and expensive infrastructures, our streets. Successful streets require management not merely maintenance and a PMS program will allow the city to undertake more efficient programs and make more effective decisions in the upkeep of our city streets. The city streets have been delineated into approximately 937 distinct sections and at this time, city staff are measuring, identifying, and rating these sections for input into the computerized PMS program.
back to top
CITY-WIDE FLOOD PREVENTION PLAN
90,000 GPM Pumps at the City's Storm Water Pumping Station.
A report was presented to the City Council which outlined a detailed and proactive flood prevention plan. The plan identified a two-phase program which combined contract labor and Public Works forces. Approximately twenty (20) miles of major open drainage channels were identified for herbicide spraying. This cost effective method ($0.30 / foot versus $1.16+ / foot for manual cleaning) would control excessive vegetative growth with two applications per year. The flow capacity of the major open channels would remain maximized through an ongoing spraying program. The second phase of the plan is the development of an inlet inventory work zone. Through systematic inspection of the inventory, Public Work crews can routinely remove blockages and debris from inlets and storm sewers. Street flooding and flash flooding can be expected to decrease each year the plan is in place.
back to top
BENCHMARKS
Need a benchmark or elevation reference point?
The City Engineering Department has established and maintained hundreds of benchmarks and elevation reference marks throughout the city. If you need reference datum for your surveying or construction project, please complete the form below and it will be sent to the Engineering Department to see if we have a benchmark in the area. If so, we will e-mail the appropriate information to you for your use. Please be sure to adequately describe the project area, i.e. address, lot/block numbers, legal description.
back to top
CAPITAL IMPROVEMENT
This listing includes projects that were underway, commenced or completed during Fiscal Year 2007 - 2008.
| Project Name |
Funding Source(s) |
Approx.
Cost |
Status |
| Main Street Improvements |
City STP |
$1,519,000 |
Complete |
| Washington Avenue Improvements (4-Lane) |
City STP |
$1,500,000 |
Design complete; Under Construction |
Bowman Boulevard
Improvements (Overlay) |
City STP |
$900,000 |
Under Design |
| Sewer Rehabilitation |
City |
$230,000 |
On-going |
| Archer Range Road Improvements |
City |
$200,000 |
Awaiting Funding |
| Herbicide Spraying Program |
City |
$35,000 |
On-going |
| Harbor Front Road (Port ICIP) |
ICIP
MDOT MM |
$670,000 |
Complete |
| Harbor Front Sanitary Sewer Extension |
Other |
$25,000 |
Awaiting Construction |
| 2001 Street Program |
City |
$500,000 |
Complete |
| Nelson / Eureka Street Improvements |
City STP |
$1,295,000 |
Under Design |
| South Colorado Street Roadway Extension |
City STP |
$3,370,000 |
Under Design |
| South Colorado Street Water and Sewer Extension |
CDBG |
$650,000 |
Under Design |
| Airlane Sanitary Sewer Improvements |
DEQ |
$2,000,000 |
Awaiting Funding |
| Producer’s Rice / C&G Railroad Rehabilitation |
CDBG DIP |
$800,000 |
Under Construction |
| Frisby Park Improvements |
City |
$17,000 |
Awaiting Funding |
| Broadway Loop Lighting Plan |
City |
$16,000 |
Under Design |
| Alexander and Colorado Street Traffic Signal |
City |
$12,000 |
Completed |
| Alexander and Beauchamp Streets Traffic Signal |
City |
$5,000 |
Completed |
| Reed Road and Fairview Avenue Traffic Signal |
City |
$6,000 |
Complete |
| Reed Road and Main St. Improvements |
City |
$150,000 |
Under Design |
| 2007 St. Bond Improvements |
City |
$2,000,000 |
Awaiting Construction |
Construction costs (un-audited) only and does not include costs for right-of-way acquisition, geotechnical analyses, engineering design, construction engineering, or in-kind services.
back to top
WATER CONNECTION CHARGES
| 5/8” METER INSTALLED ON AN EXISTING STUB |
$81.00 |
| 1” METER INSTALLED ON AN EXISTING STUB |
$158.00 |
| 2” METER INSTALLED ON AN EXISTING STUB |
$473.00 |
| 5/8” METER INSTALLED-LINE TO BE TAPPED |
$307.00 |
| 1” METER INSTALLED-LINE TO BE TAPPED |
$386.00 |
| 11/2” METER INSTALLED-LINE TO BE TAPPED |
$790.00 |
| 2” METER INSTALLED-LINE TO BE TAPPED |
$900.00
|
***IF LINE TO BE TAPPED IS IN OR ACROSS A CONCRETE OR ASPHALT STREET*** |
| 5/8” METER INSTALLED |
$657.00 |
| 1” METER INSTALLED |
$736.00 |
| 11/2” METER INSTALLED |
$1140.00 |
| 2” METER INSTALLED |
$1200.00 |
back to top
ITEMS REQUIRING ROADBOAR REQUIRE A 21 WORKING DAY NOTICE. SHORT NOTICE REQUIRES ROAD CUT, AND ADDITIONAL $300.00
ALL METERS SIZES LARGER THAN 2” WILL BE INSTALLED AT ACTUAL COST
SPECIAL COMMERCIAL METERS AS NECESSARY
DEPOSIT ON WATER METERS
| |
Inside City |
Outside City |
| 5/8"
METER |
$80.00 |
$160.00 |
| 5/8"
NON HOME OWNER |
$80.00 |
$160.00 |
| 1"
METER |
$80.00 |
$160.00 |
| 1/1/2"
METER |
$80.00 |
$160.00 |
| 2"
METER |
$80.00 |
$160.00 |
back to top
| LOCATE STUB ON GROUND |
$25.00 |
| DIG UP STUB IN GROUND |
$125.00 |
| INSTALL 6" STUB OFF OF MAIN LINE |
$250.00 |
| BUILD MANHOLE 5" AND 6" STUB OUT |
$474.00 |
back to top
RESIDENTIAL AND BUSINESS GARBAGE CAN CHARGES
Residences are supplied with one garbage can at the time of water meter connection. An additional can maybe obtained for a non refundable fee of $64.00.
Businesses may obtain a residential size garbage can for a non refundable fee of $64.00 or contract with one of the local waste management companies to have garbage picked up.
The residential and small business garbage service will be billed on the water meter bill each month at a rate of $14.00 per can.
back to top
BLUE LINE & XEROX COPY CHARGES
| XEROX COPIES |
$0.25 PER COPY |
| 24" X 36" |
$4.00 PER SHEET |
| 32" X 32" SHEETS |
$5.00 PER SHEET |
| ALL OTHERS SIZES |
$0.75 PER SQ. FT. |
back to top
|